Skip to content

Glossary

The words below are used in exactly these meanings, across the product, the API and these pages.

TermMeaning
Active windowA project’s start and end dates. A ticket outside it is flagged “project not active”, judged by a load’s time (its collection’s end)
AssignmentOne person’s work for one day: a project, their work (ticket types, unit rate pay items, certifying), one site where the work is at one, optionally a phone. Written on the dispatch board, or on the phone with the master passcode when there is none (an unplanned assignment, marked). Never expires, never stops work
Audit recordOne entry in the append-only audit log: a change’s prior and new values, who, from where and why, written by the database itself
BadgeCarries the cert number; scanned at New to load the truck’s or crew’s certification
CertificationA one-time inspection of a container (measured, capacity in CY, five photographs) or a crew (not measured), never a vehicle. Never ends on its own; tag expiry, revocation and replacement flag later tickets
Cert numberOne number: cert = placard = badge. Issued from the project’s series or taken from pre-printed paper; unique per project; copied onto every field event
Citizen drop-off logA record, not a ticket, that a resident dropped debris at a site. No quantity, number or cost
ClientThe jurisdiction or agency paying for cleanup, such as Bayline County. A record, reused across disasters
Client packageThe deliverable: a project’s final tickets, photographs, receipts and transactions, assembled by hand from the exports and zipped. There is no invoice record
Client userA read-only viewer login that belongs to a client
Completed load / haul-outCLT / CHO: the record the worker concludes from a ticket’s field events. Not an event itself; the only load record that is QC’d and locked
ContractA name, its prime and an optional link to the signed copy. A rule names one and runs only on its prime’s tickets
ContractorA hauling company: a prime holds a contract; a sub works under one prime, at most two tiers, typed in at certification
Control ticketA pre-printed, barcoded ticket number, from ranges entered at setup. The alternative is numbers the phones make, in blocks
Crew timeA unit rate ticket listing items with hours to the quarter hour; it bills the highest item’s hours, once
Debris typeWhat a load or haul-out monitor picks on Complete, at both ends: an entry on the project’s form, named as the contract names the work (Vegetative, C&D, Mulch…). A difference between the two field events is flagged
Declaration eventThe disaster and its reference, such as Hurricane Delphine, DR-9001-FL. One shared record; many clients’ projects point at it. Never shortened to “event”
Dispatch boardThe back office’s daily plan of assignments
Disposal siteWhere debris legally goes: a site type (TDSR/DMS, Final Disposal, Transfer Station, Other) plus its facts (Takes loads, Haul-outs leave here, Charges a tipping fee, Ineligible site), a permit, GPS, an area and its dates
FDS / TDSRFinal disposal site / temporary debris staging and reduction site (DMS means the same). Debris is reduced at a TDSR and hauled out to an FDS
Field eventWhat one monitor records under a ticket number: collection COL, disposal DIS, haul-out collection HOC, haul-out disposal HOD, unit rate URT. The evidence: never edited by the monitor after submitting, corrected in place by permission
Field monitorA field observer who records field events on an enrolled phone; has a system Monitor ID such as M004127
Field tagA project list the firm fills (such as Mixed), read by the Field tag rule criterion and exports. No phone asks for one
FirmThe organisation that installs Open ADMS and runs its own installation, usually a debris monitoring firm
FlagHow every problem is raised after setup: a plain message (“Ticket 101008: debris type mismatch. Flagged for review.”), never a refusal. Fixed, or accepted with a reason
FormWhat a project uses for one kind of document (load, haul-out, unit rate, truck certificate, ROE, survey, incident, drop-off log); debris types are added to it
Haul-outThe second leg: debris leaving a TDSR for final disposal, its load call taken at the loading end
InstallationOne firm’s running copy of Open ADMS
Invoice lock / batchLocking QC Approved tickets as invoiced, optionally in a named batch. A locked ticket is unlocked, audited, before any change
Load callThe percentage of a container’s certified capacity a monitor sees filled, a whole number 0–100. Billable CY = capacity × load call
Login listThe sign-in checks a set-up phone holds for its project’s monitors, for signing in offline
Master passcodeOne per firm: it enrols and sets up phones and opens the supervisor’s actions
MileageThe road distance of the shortest route on public roads from the collection’s end to the disposal site’s own GPS, from the installation’s own routing server; with no route, the straight line, flagged
Pay itemA priced line of the contract as set up: its code (unique on its project), its description, payable type, unit of measure, size band, capture settings and a rate for each prime. The only place a rate lives
Payable typeThe work a pay item prices, from the firm’s list (Vegetative, C&D, Hangers, Stumps, Crew time, Tipping fee…)
PreloadA load collected one day and dumped the next. Normal, not flagged; it counts on its collection’s day
Program typeThe kind of work (ROW, PARKS, PPDR, WATERWAY, the firm’s own), each with a Requires ROE setting
ProjectOne body of work for one client under one declaration event: the hub everything hangs off
QC statusQC Review, QC Approved, QC Issues, QC Void: the back office’s own mark, set by hand, separate from the status
QuarantineWhere a sync puts a second field event of one kind on one ticket: kept in full, for a person to resolve. Never dropped
Read-only viewerA client user, a contractor user or an auditor, who reads but never changes
ReconciliationThe worker’s run: group a ticket’s field events, check them, attach zone and mileage, price, write
ROERight of entry: a record (number, parcel, owner, signed date, scope, photograph); on a project whose program type requires it, every collection, unit rate ticket and survey carries one
RuleThe firm’s pricing, per form: one contract, its criteria, and actions Add transaction #n, Remove transaction #n, Void ticket. All passing rules run in # order
Scale receiptThe paper a final disposal site’s scale house hands the tower; not a ticket. Hand-transcribed, only where the contract pays by weight
Split loadOne truck gathering from several properties: collections -A, -B… and one disposal on the base number; each property’s share priced on its own
StatusPENDING, COMPLETED, MANUAL_REVIEW, VOID. Review still bills; only a person (with a reason) or a rule voids
StumpA unit rate ticket: diameter two feet up (under 24 in flagged), root-ball diameter, half or more exposed; paid by the stump or by the fill
TBNTo be negotiated: a pay item whose price isn’t agreed; it bills nothing until it is
TicketA ticket number and the field events recorded under it. Paper and printouts are receipts, never records
Time clockAn optional per-project add-on for workers’ own hours, on their assignment; never related to crew-time billing
TransactionOne priced line created by a rule: pay item, quantity, the named contract’s prime’s rate, prime and operating sub. Regenerated when its ticket changes
Unit rate workWork billed per each, per pound or per hour rather than per load: one monitor, one place, one ticket, no pairing
ZoneA named shape on the project’s map. No monitor records it: reconciliation attaches it from the GPS